Skip to content
  • English
    • Deutsch
    • Italiano
    • Français
    • Русский
    • polski
    • Español
  • Newsletter
Top Bar (en)
Facebook page opens in new windowInstagram page opens in new windowYouTube page opens in new windowLinkedin page opens in new window
BIOG
Solutions for green energy
BIOGBIOG
  • Home
  • Company
    • Company
    • Company history
    • Certification
  • Products
    • Harvesting technology – BioChipper
    • Complete system – BioCrusher
    • Feeding technology – BioFeeder
    • Mixing system – BioMerge
    • Foreign body separation
    • CNG farm filling station
    • Processing technology
    • Conveying technology
    • Pumping technology
    • Control and electrics
    • Hygienization
  • Service
    • Spare Parts
  • News
    • Updates
    • Trade Fairs / Events
    • Video
  • Contact
    • Contact person
Search:
  • Home
  • Company
    • Company
    • Company history
    • Certification
  • Products
    • Harvesting technology – BioChipper
    • Complete system – BioCrusher
    • Feeding technology – BioFeeder
    • Mixing system – BioMerge
    • Foreign body separation
    • CNG farm filling station
    • Processing technology
    • Conveying technology
    • Pumping technology
    • Control and electrics
    • Hygienization
  • Service
    • Spare Parts
  • News
    • Updates
    • Trade Fairs / Events
    • Video
  • Contact
    • Contact person
You are here:
  1. Home
  2. 2025

Premiere: the first Limator in the Series 4 has been successfully installed!

ProjectsBy Silvia Schrattenecker13. November 2025

Premiere: the first Limator in the Series 4 has been successfully installed! DATA and FACTS: BioFeeder 120 m³ with Limator and BioMerge Material: maize straw Throughput: 16 tonnes / hour Power consumption: 5,1 kW / hour

Upgrade of a biogas plant in Upper Bavaria

ProjectsBy Silvia Schrattenecker5. November 2025

Upgrade of a biogas plant in Upper Bavaria Installation of a BioFeeder with defibrator and liquid feeding with stone separation. FACTS and FIGURES: BioFeeder 140 m³ with Limator and BioMerge Material: cattle, horse and chicken manure Throughput: 13 tonnes/hour Power consumption: 7 kW/hour

BioFeeder on the way to Latvia!

NewsBy Silvia Schrattenecker27. October 2025

BioFeeder on the way to Latvia! Thanks to its specially designed insulation, this 140 m³ BioFeeder is perfectly equipped for use in regions with low temperatures – reliable, efficient and durable.

BIOG
  • Privacy policy
  • Terms & Conditions
  • Imprint
Rechtliches (en)
Go to Top
  • Schreiben Sie uns