BioFeeder twin pack: the first two BioFeeders in South West England were installed at the biogas plant near Wincanton.

BioFeeder twin pack: the first two BioFeeders in South West England were installed at the biogas plant near Wincanton. DATEN und FAKTEN: 1st BioFeeder: 120 m³ with Limator and BioMerge 2nd BioFeeder: 100 m³ with plug auger Material: corn, grass, straw, chicken manure and pig manure Throughput: 12 tonnes / hour Power consumption: 8 kW…

That was Smart Energy Day 2024!

That was the Smart Energy Day 2024! Regional, independent, CO2-free energy production The SMART ENERGY DAY took place on our company premises on 20 September. On this day, we showed the regional circular economy LIVE – so you could experience the technology in practice:   Harvesting field residues – maize straw Storage of field residues…